سبد خرید
Kurdistan
سبد خرید

Drainage pipe

The drainage pipe is produced in the sizes of 100mm,160mm,125mm, 200mm cover and without cover, the connections of all sizes are made by hand and the packaging is coil.
Description

Removing excess water from a specific surface and passage and location, removing underground water, runoff by pumping or gravity flow is called drainage.                                                                         Drainage is carried out in two specific fields, one of the civil and construction industry to remove excess water from the path of the structure, and the structure, and the other is to control the water level in agricultural fields to control the minerals in the soil and maintain the quality of the soil.                                                                                  Drainage in the past was done with traditional methods, using cement pipe, stones and leaves of trees. In Iran, drainage was done during the Achaemenid period, but in the contemporary period in the Khuzestan, in the faculty of agriculture, and later, using thin-walled polyethylene and P.V.C pipes. It used to be that the pipe was drilled and grooved according to the need.

 

What is a drainage pipe?

The best method for drainage is piping, many of the old traditional drainage methods have been by making man-made pits and channels out of clay and mud and recently cement.

Drainage with new methods was using P.V.C, polyethylene, and iron pipes that drilled by plumbers, and preparing these pipes was a difficult and time-consuming task, and of course, it had a lot of costs and no definite moisture. Polyethylene pipes were better than all methods because they are in coil form and it is possible to carry 100 meters of pipe in one coil and it is easily pierced, but any way, piercing polyethylene pipes is expensive and takes more times. Recently, drainage pipes are produced from P.V.C material, they are very light, they are perforated and ready to use.

 

P.V.C drainage pipes

The production of drainage pipe is very precise. First, the pipe is produced using P.V.C materials by extruder method, and then according to the customer’s needs, semi- reticulate or full reticulate is prepared in certain formats, and if there is a need to cover, the fibers it is woven around the pipe using modern textile methods.P.V.C drainage pipes are very flexible and light, but they cannot withstand a lot of traffic load; for this reason, they are installed at a high depth and granulate stones and sand are placed on them. In cases where it is necessary to withstand a lot of traffic load, polyethylene carrugate pipes are used, which are drilled with the help of a drill or a milling cutter.The use of drainage system is very important, if the water remains in the agricultural land and the volume of water is not properly controlled, it will cause serious damage to the agricultural system. If the water remains in the path of the buildings and is not removed properly, the water destrings the building, it is also very vital for the walls and brigades because it leads to the collapse of the wall or brigade.

Drainage has a very small cost compared to other costs in construction, if the drainage is not done accurately and correctly, the water stays in the path of walls, brigades and buildings causes a lot of damage to the infrastructure.

The price of the pipe is very suitable considering that it is a light pipe; on the other hand, this pipe does not need to be drilled and the cost of transportation and implementation is very economical.

Buying a drain pipe is very easy; it is enough to specify the size of the pipe first, then specify whether you want it to be covered or whether you want to cover it without cover using stoned and sand, and finally determine which type you want between the two types of full reticulate or semi-reticulate you want.

 

Drainage pipe standard

Drainage pipes are produced based on DIN1187.Standard and national standard 7669.An important point in maintaining these pipes is not to collect oil and derivatives with these pipes. covered pipes were first used by the Germans in1960, which was very effective in the development of these industry later. The use of these covers made it unnecessary to lay the trench and the project costs were greatly reduce.

More Fold
همکاران ما
polirood
pg
download
download (1)
about
sepahan
pp
Poolirood
مراحل خرید

ثبت سفارش

ارتباط با کارشناسان فروش ما جهت مشاوره و خرید تماس با شماره زیر یا ارسال درخواست در سایت:
021-71057272
09101112054
مرحله اول

صدور پیش فاکتور

کارشناسان فروش ما به محض ثبت درخواست شما کمتر از 30 دقیقه با شما تماس خواهند گرفت.
مرحله دوم

تسویه حساب

بر اساس توافق در مفاد پیش فاکتور تسویه حساب یه صورت نقدی و یا اعتباری انجام میشود.
مرحله سوم

ارسال و لجستیک

کالاهایی که از نظر کیفیت تایید شده اند پس از بارگیری و بر اساس نرخ مصوب مورد تایید شما به مقصد ارسال میشود.
مرحله چهارم

صدور فاکتور رسمی

پس از مشخص شدن ارزش دقیق خرید شما تسویه نهایی صورت میگیرد و سپس فاکتور رسمی خرید شما چاپ و ارسال میگردد.
مرحله پنجم

خدمات مشتریان

ما به پاس قدردتانی از اعتماد مشتریان عزیزمان باشگاه مشتریان راه اندازی کردیم که در صورت خرید شما یک اعتبار نقدی به شما تعلق گرفته و داخل کیف پولتان شارژ میشود که در خرید بعدی میتوانید به راحتی از اعتبار خرید قبلی استفاده کرده و خرید کنید.
مرحله ششم
تیم ما
user
مسعود متینی
مدیر عامل
user
علیرضا متینی
مدیر فروش
user
علی آریان
مدیر ثبت سفارش
user
خانم احمدی
کارشناس فروش
user
خانم یوسفی
کارشناس فروش
user
خانم مرادی
کارشناس فروش
user
خانم دینوری
واحد لجستیک
user
خانم شمخانی
واحد مالی
user
خانم رضاپور
واحد بازاریابی
user
خانم باقیان
مسئول سایت
user
خانم موسوی
واحد صادرات
user
خانم خالدی
واحد صادرات
user
خانم صمدی
باشگاه مشتریان
مشتریان ما
در حال به روز رسانی نظرات مشتریان...

ثبت سفارش Drainage pipe

درخواست ثبت سفارش شما ثبت گردید.

درخواست ثبت سفارش شما با موفقیت ثبت گردید. پیرو این درخواست تیم پشتیبانی ما در سریع ترین زمان ممکن با شما تماس خواهد گرفت.